Shopping Cart
Your Cart is Empty
Quantity:
Subtotal
Taxes
Shipping
Total
There was an error with PayPalClick here to try again
CelebrateThank you for your business!You should be receiving an order confirmation from Paypal shortly.Exit Shopping Cart

D G Construction

A Bonus Bonus Room

KITCHEN PLAN

« Back to Album Photo 3 of 45 Previous | Next
KITCHEN PLAN
We figured the water line and found an easy path from the main shut off in the house through the crawl space up into the garage wall, into the attic space of the bonus room and through the floor to where the bathroom and kitchen would be.
Posted by davidgaleconstructionanddesign on April 3, 2010 Full Size|

Post a Comment

Oops!

Oops, you forgot something.

Oops!

The words you entered did not match the given text. Please try again.

Already a member? Sign In

0 Comments